HTS Heading 7016
Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass, whether or not wired, of a kind used for building or construction purposes; glass cubes and other glass smallwares, whether or not on a backing, for mosaics or similar decorative purposes; leaded glass windows and the like; multicellular or foam glass in blocks, panels, plates, shells or similar forms
All 4 HTS codes under heading 7016 (paving blocks, slabs, bricks, squares), with their duty rates from the 2026 HTS Revision 23. General duty 2.7% to 8%.
Every line of heading 7016
- 7016 Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass, whether or not wired, of a kind used for building or construction purposes; glass cubes and other glass smallwares, whether or not on a backing, for mosaics or similar decorative purposes; leaded glass windows and the like; multicellular or foam glass in blocks, panels, plates, shells or similar forms.
- 7016.10.00.00 Glass cubes and other glass smallwares, whether or not on a backing, for mosaics or similar decorative purposes (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7016.90 Other (under: Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass, whether or not wired, of a kind used for building or construction purposes; glass cubes and other glass smallwares, whether or not on a backing, for mosaics or similar decorative purposes; leaded glass windows and the like; multicellular or foam glass in blocks, panels, plates, shells or similar forms).
- 7016.90.10 Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass: General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 7016.90.10.10 Bricks and blocks (under: Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass) (No.).
- 7016.90.10.50 Other (under: Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass) (No.).
- 7016.90.50.00 Other (under: Other) (No.): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.