HTS Heading 7015

Clock or watch glasses and similar glasses, glasses for noncorrective or corrective spectacles, curved, bent, hollowed or the like, not optically worked; hollow glass spheres and their segments, for the manufacture of such glasses

All 4 HTS codes under heading 7015 (clock or watch glasses and similar glasses), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7015

  • 7015 Clock or watch glasses and similar glasses, glasses for noncorrective or corrective spectacles, curved, bent, hollowed or the like, not optically worked; hollow glass spheres and their segments, for the manufacture of such glasses.
  • 7015.10.00.00 Glasses for corrective spectacles (No.): General Free; Special none; Column 2 40%.
  • 7015.90 Other (under: Clock or watch glasses and similar glasses, glasses for noncorrective or corrective spectacles, curved, bent, hollowed or the like, not optically worked; hollow glass spheres and their segments, for the manufacture of such glasses).
  • 7015.90.10.00 Round (under: Watch glasses) (No.): General Free; Special none; Column 2 60%.
  • 7015.90.20.00 Other (under: Watch glasses) (No.): General Free; Special none; Column 2 60%.
  • 7015.90.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.