HTS Heading 7101
Pearls, natural or cultured, whether or not worked or graded but not strung, mounted or set; pearls, natural or cultured, temporarily strung for convenience of transport
All 5 HTS codes under heading 7101 (pearls, natural or cultured), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7101
- 7101 Pearls, natural or cultured, whether or not worked or graded but not strung, mounted or set; pearls, natural or cultured, temporarily strung for convenience of transport.
- 7101.10 Natural pearls (under: Pearls, natural or cultured, whether or not worked or graded but not strung, mounted or set; pearls, natural or cultured, temporarily strung for convenience of transport).
- 7101.10.30.00 Graded and temporarily strung for convenience of transport (g): General Free; Special none; Column 2 10%.
- 7101.10.60.00 Other (under: Natural pearls) (g): General Free; Special none; Column 2 10%.
- 7101.21.00.00 Unworked (under: Cultured pearls) (g): General Free; Special none; Column 2 10%.
- 7101.22 Worked (under: Cultured pearls).
- 7101.22.30.00 Graded and temporarily strung for convenience of transport (g): General Free; Special none; Column 2 10%.
- 7101.22.60.00 Other (under: Worked) (g): General Free; Special none; Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.