HTS Heading 7102

Diamonds, whether or not worked, but not mounted or set

All 11 HTS codes under heading 7102 (diamonds, whether or not worked), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7102

  • 7102 Diamonds, whether or not worked, but not mounted or set.
  • 7102.10.00.00 Unsorted (under: Diamonds, whether or not worked, but not mounted or set) (carat): General Free; Special none; Column 2 Free.
  • 7102.21 Unworked or simply sawn, cleaved or bruted.
  • 7102.21.10 Miners' diamonds (under: Unworked or simply sawn, cleaved or bruted): General Free; Special none; Column 2 Free.
  • 7102.21.10.10 Carbonados (under: Miners' diamonds) (carat).
  • 7102.21.10.20 Other (under: Miners' diamonds) (carat).
  • 7102.21.30.00 Simply sawn, cleaved or bruted (carat): General Free; Special none; Column 2 30%.
  • 7102.21.40.00 Other (under: Other) (carat): General Free; Special none; Column 2 Free.
  • 7102.29.00 Other (under: Industrial): General Free; Special none; Column 2 Free.
  • 7102.29.00.10 Carbonados (under: Miners' diamonds) (carat).
  • 7102.29.00.20 Other (under: Miners' diamonds) (carat).
  • 7102.29.00.50 Other (under: Other) (carat).
  • 7102.31.00.00 Unworked or simply sawn, cleaved or bruted (carat): General Free; Special none; Column 2 Free.
  • 7102.39.00 Other (under: Nonindustrial): General Free; Special none; Column 2 10%.
  • 7102.39.00.10 Weighing not over 0.5 carat each (carat).
  • 7102.39.00.50 Weighing over 0.5 carat each (under: Other) (carat).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.