HTS Heading 7106
Silver (including silver plated with gold or platinum), unwrought or in semimanufactured forms, or in powder form
All 6 HTS codes under heading 7106 (silver), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 7106
- 7106 Silver (including silver plated with gold or platinum), unwrought or in semimanufactured forms, or in powder form.
- 7106.10.00.00 Powder (under: Silver (including silver plated with gold or platinum), unwrought or in semimanufactured forms, or in powder form) (g): General Free; Special none; Column 2 Free.
- 7106.91 Unwrought (under: Other).
- 7106.91.10 Bullion and dore (under: Unwrought): General Free; Special none; Column 2 Free.
- 7106.91.10.10 Bullion (under: Bullion and dore) (Ag g).
- 7106.91.10.20 Dore (under: Bullion and dore) (Ag g).
- 7106.91.50.00 Other (under: Unwrought) (g): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7106.92 Semimanufactured (under: Other).
- 7106.92.10.00 Rectangular or near rectangular shapes, containing 99.5 percent or more by weight of silver and not otherwise marked or decorated than with weight, purity, or other identifying information (g): General Free; Special none; Column 2 Free.
- 7106.92.50.00 Other (under: Semimanufactured) (g): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.