HTS Heading 7105
Dust and powder of natural or synthetic precious or semi- precious stones
All 6 HTS codes under heading 7105 (dust and powder of natural or synthetic precious), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7105
- 7105 Dust and powder of natural or synthetic precious or semi- precious stones.
- 7105.10.00 Of diamonds (under: Dust and powder of natural or synthetic precious or semi- precious stones): General Free; Special none; Column 2 Free.
- 7105.10.00.11 80 mesh or finer (under: Natural) (carat).
- 7105.10.00.15 Other (under: Natural) (carat).
- 7105.10.00.20 Coated with metal (under: Synthetic) (carat).
- 7105.10.00.30 80 mesh or finer (under: Other) (carat).
- 7105.10.00.50 Other (under: Other) (carat).
- 7105.90.00.00 Other (under: Dust and powder of natural or synthetic precious or semi- precious stones) (kg): General Free; Special none; Column 2 2.2¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.