HTS Heading 7110
Platinum, unwrought or in semimanufactured forms, or in powder form
All 14 HTS codes under heading 7110 (platinum, unwrought or in semimanufactured forms), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7110
- 7110 Platinum, unwrought or in semimanufactured forms, or in powder form.
- 7110.11.00 Unwrought or in powder form (under: Platinum): General Free; Special none; Column 2 Free.
- 7110.11.00.10 Grain and nuggets of the metal platinum (Pt g).
- 7110.11.00.20 Sponge of the metal platinum (under: Unwrought or in powder form) (Pt g).
- 7110.11.00.50 Other (under: Unwrought or in powder form) (Pt g).
- 7110.19.00.00 Other (under: Platinum) (Pt g): General Free; Special none; Column 2 Free.
- 7110.21.00.00 Unwrought or in powder (under: Palladium) (Pd g): General Free; Special none; Column 2 Free.
- 7110.29.00.00 Other (under: Palladium) (Pd g): General Free; Special none; Column 2 Free.
- 7110.31.00.00 Unwrought or in powder form (under: Rhodium) (Rh g): General Free; Special none; Column 2 Free.
- 7110.39.00.00 Other (under: Rhodium) (Rh g): General Free; Special none; Column 2 Free.
- 7110.41.00 Unwrought or in powder form (under: Iridium, osmium and ruthenium): General Free; Special none; Column 2 Free.
- 7110.41.00.10 Iridium (under: Separately) (Ir g).
- 7110.41.00.20 Osmium (under: Separately) (Os g).
- 7110.41.00.30 Ruthenium (under: Separately) (Ru g).
- 7110.41.00.50 Other (under: Unwrought or in powder form) (g).
- 7110.49.00 Other (under: Iridium, osmium and ruthenium): General Free; Special none; Column 2 Free.
- 7110.49.00.10 Iridium separately (under: Other) (Ir g).
- 7110.49.00.50 Other (under: Other) (g).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.