HTS Heading 7111
Base metals, silver or gold, clad with platinum, not further worked than semimanufactured
The HTS code under heading 7111 (base metals, silver or gold, clad with platinum), with its duty rates from the 2026 HTS Revision 23. General duty 10%.
Every line of heading 7111
- 7111.00.00.00 Base metals, silver or gold, clad with platinum, not further worked than semimanufactured (g): General 10%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.