HTS Heading 7201

Pig iron and spiegeleisen in pigs, blocks or other primary forms

All 4 HTS codes under heading 7201 (pig iron and spiegeleisen in pigs), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7201

  • 7201 Pig iron and spiegeleisen in pigs, blocks or other primary forms.
  • 7201.10.00.00 Nonalloy pig iron containing by weight 0.5 percent or less of phosphorus (t): General Free; Special none; Column 2 $1.11/t.
  • 7201.20.00.00 Nonalloy pig iron containing by weight more than 0.5 percent of phosphorus (t): General Free; Special none; Column 2 $1.11/t.
  • 7201.50 Alloy pig iron; spiegeleisen (under: Pig iron and spiegeleisen in pigs, blocks or other primary forms).
  • 7201.50.30.00 Alloy pig iron (under: Alloy pig iron; spiegeleisen) (t): General Free; Special none; Column 2 $1.11/t.
  • 7201.50.60.00 Spiegeleisen (under: Alloy pig iron; spiegeleisen) (t): General Free; Special none; Column 2 0.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.