HTS Chapter 72
Iron and steel
The 29 headings and 559 HTS codes of chapter 72 (iron and steel), with their duty rates from the 2026 HTS Revision 23.
The 29 headings of chapter 72
- 7201: Pig iron and spiegeleisen in pigs, blocks or other primary forms (4 codes, General duty Free)
- 7202: Ferroalloys (28 codes, General duty Free to 10%)
- 7203: Ferrous products obtained by direct reduction of iron ore and other spongy ferrous products, in lumps, pellets or similar forms; iron having a minimum purity by weight of 99.94 percent, in lumps, pellets or similar forms (2 codes, General duty Free)
- 7204: Ferrous waste and scrap; remelting scrap ingots of iron or steel (14 codes, General duty Free)
- 7205: Granules and powders, of pig iron, spiegeleisen, iron or steel (3 codes, General duty Free)
- 7206: Iron and nonalloy steel in ingots or other primary forms (excluding iron of heading 7203) (2 codes, General duty Free)
- 7207: Semifinished products of iron or nonalloy steel (9 codes, General duty Free)
- 7208: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, hot-rolled, not clad, plated or coated (32 codes, General duty Free)
- 7209: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, cold-rolled (cold-reduced), not clad, plated or coated (22 codes, General duty Free)
- 7210: Flat-rolled products of iron or nonalloy steel, of a width of 600 mm or more, clad, plated or coated (21 codes, General duty Free)
- 7211: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, not clad, plated or coated (25 codes, General duty Free)
- 7212: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated (10 codes, General duty Free)
- 7213: Bars and rods, hot-rolled, in irregularly wound coils, of iron or nonalloy steel (12 codes, General duty Free)
- 7214: Other bars and rods of iron or nonalloy steel, not further worked than forged, hot-rolled, hot-drawn or hot-extruded, but including those twisted after rolling (18 codes, General duty Free)
- 7215: Other bars and rods of iron or nonalloy steel (12 codes, General duty Free)
- 7216: Angles, shapes and sections of iron or nonalloy steel (18 codes, General duty Free)
- 7217: Wire of iron or nonalloy steel (48 codes, General duty Free)
- 7218: Stainless steel in ingots or other primary forms; semi-finished products of stainless steel (9 codes, General duty Free)
- 7219: Flat-rolled products of stainless steel, of a width of 600 mm or more (76 codes, General duty Free)
- 7220: Flat-rolled products of stainless steel, of a width of less than 600 mm (24 codes, General duty Free)
- 7221: Bars and rods, hot-rolled, in irregularly wound coils, of stainless steel (6 codes, General duty Free)
- 7222: Other bars and rods of stainless steel; angles, shapes and sections of stainless steel (31 codes, General duty Free)
- 7223: Wire of stainless steel (8 codes, General duty Free)
- 7224: Other alloy steel in ingots or other primary forms; semi-finished products of other alloy steel (11 codes, General duty Free)
- 7225: Flat-rolled products of other alloy steel, of a width of 600 mm or more (28 codes, General duty Free)
- 7226: Flat-rolled products of other alloy steel, of a width of less than 600 mm (26 codes, General duty Free)
- 7227: Bars and rods, hot-rolled, in irregularly wound coils, of other alloy steel (14 codes, General duty Free)
- 7228: Other bars and rods of other alloy steel; angles, shapes and sections, of other alloy steel; hollow drill bars and rods, of alloy or nonalloy steel (35 codes, General duty Free)
- 7229: Wire of other alloy steel (11 codes, General duty Free)
Where it sits in the schedule
Chapter 72 is in Section XV of the Harmonized System, base metals and their articles (chapters 72 to 83). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.