HTS Heading 7118

Coin

All 5 HTS codes under heading 7118 (coin), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7118

  • 7118 Coin.
  • 7118.10.00.00 Coin (other than gold coin), not being legal tender (g): General Free; Special none; Column 2 Free.
  • 7118.90.00 Other (under: Coin): General Free; Special none; Column 2 Free.
  • 7118.90.00.11 Canadian maple leaf (under: Gold) (g, Au g).
  • 7118.90.00.19 Other (under: Gold) (g, Au g).
  • 7118.90.00.20 Platinum (under: Other) (g, Pt g).
  • 7118.90.00.55 Other (under: Other) (g).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.