HTS Heading 7203
Ferrous products obtained by direct reduction of iron ore and other spongy ferrous products, in lumps, pellets or similar forms; iron having a minimum purity by weight of 99.94 percent, in lumps, pellets or similar forms
All 2 HTS codes under heading 7203 (ferrous products obtained by direct), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7203
- 7203 Ferrous products obtained by direct reduction of iron ore and other spongy ferrous products, in lumps, pellets or similar forms; iron having a minimum purity by weight of 99.94 percent, in lumps, pellets or similar forms.
- 7203.10.00.00 Ferrous products obtained by direct reduction of iron ore (t): General Free; Special none; Column 2 $2.21/t.
- 7203.90.00.00 Other (under: Ferrous products obtained by direct reduction of iron ore and other spongy ferrous products, in lumps, pellets or similar forms; iron having a minimum purity by weight of 99.94 percent, in lumps, pellets or similar forms) (t): General Free; Special none; Column 2 $2.21/t.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.