HTS Heading 7204
Ferrous waste and scrap; remelting scrap ingots of iron or steel
All 14 HTS codes under heading 7204 (ferrous waste and scrap), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7204
- 7204 Ferrous waste and scrap; remelting scrap ingots of iron or steel.
- 7204.10.00.00 Waste and scrap of cast iron (under: Ferrous waste and scrap; remelting scrap ingots of iron or steel) (t): General Free; Special none; Column 2 74¢/t.
- 7204.21.00.00 Of stainless steel (under: Waste and scrap of alloy steel) (t): General Free; Special none; Column 2 74¢/t.
- 7204.29.00.00 Other (under: Waste and scrap of alloy steel) (t): General Free; Special none; Column 2 74¢/t.
- 7204.30.00.00 Waste and scrap of tinned iron or steel (t): General Free; Special none; Column 2 Free.
- 7204.41.00 Turnings, shavings, chips, milling waste, sawdust, filings, trimmings and stampings, whether or not in bundles: General Free; Special none; Column 2 74¢/t.
- 7204.41.00.20 No. 1 bundles (under: Turnings, shavings, chips, milling waste, sawdust, filings, trimmings and stampings, whether or not in bundles) (t).
- 7204.41.00.40 No. 2 bundles (under: Turnings, shavings, chips, milling waste, sawdust, filings, trimmings and stampings, whether or not in bundles) (t).
- 7204.41.00.60 Borings, shovelings and turnings (t).
- 7204.41.00.80 Other (under: Turnings, shavings, chips, milling waste, sawdust, filings, trimmings and stampings, whether or not in bundles) (t).
- 7204.49.00 Other (under: Other waste and scrap): General Free; Special none; Column 2 74¢/t.
- 7204.49.00.20 No. 1 heavy melting (under: Other) (t).
- 7204.49.00.40 No. 2 heavy melting (under: Other) (t).
- 7204.49.00.60 Cut plate and structural (under: Other) (t).
- 7204.49.00.70 Shredded (under: Other) (t).
- 7204.49.00.80 Other (under: Other) (t).
- 7204.50.00.00 Remelting scrap ingots (under: Ferrous waste and scrap; remelting scrap ingots of iron or steel) (t): General Free; Special none; Column 2 74¢/t.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.