HTS Heading 7213
Bars and rods, hot-rolled, in irregularly wound coils, of iron or nonalloy steel
All 12 HTS codes under heading 7213 (bars and rods, hot-rolled), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7213
- 7213 Bars and rods, hot-rolled, in irregularly wound coils, of iron or nonalloy steel.
- 7213.10.00.00 Concrete reinforcing bars and rods (kg): General Free; Special none; Column 2 20%.
- 7213.20.00 Other, of free-cutting steel (under: Bars and rods, hot-rolled, in irregularly wound coils, of iron or nonalloy steel): General Free; Special none; Column 2 5.5%.
- 7213.20.00.10 Containing by weight 0.1 percent or more of lead (kg).
- 7213.20.00.80 Other (under: Other, of free-cutting steel) (kg).
- 7213.91 Of circular cross section measuring less than 14 mm in diameter.
- 7213.91.30 Not tempered, not treated and not partly manufactured: General Free; Special none; Column 2 5.5%.
- 7213.91.30.11 Tire cord-quality steel wire rod of a kind described in statistical note 5 to this chapter (kg).
- 7213.91.30.15 Of Cold Heading Quality (CHQ) steel of a kind described in statistical note 6 to this chapter (kg).
- 7213.91.30.20 Of welding quality wire rods of a kind described in statistical note 7 to this chapter (kg).
- 7213.91.30.93 Other (under: Not tempered, not treated and not partly manufactured) (kg).
- 7213.91.45.00 Containing by weight 0.6 percent or more of carbon (kg): General Free; Special none; Column 2 5.5%.
- 7213.91.60.00 Other (under: Other) (kg): General Free; Special none; Column 2 6%.
- 7213.99.00 Other (under: Other): General Free; Special none; Column 2 5.5%.
- 7213.99.00.30 With a diameter of 14 mm or more but less than 19 mm (kg).
- 7213.99.00.60 With a diameter of 19 mm or more (kg).
- 7213.99.00.90 Other (under: Other) (kg).
From MFG Calcs data: Steel bar, rod, and wire
U.S. imports of steel bar, rod, and wire (headings 7213, 7214, 7215, 7216, 7217) came to $2.93B in 2025, with $647M in calculated duty: an effective duty of 22.1%, every duty included.
Effective duty in Sep 2026: 35.4%, against 34.8% in Sep 2025.
Largest sources in 2025: Canada $579M at 19.8% effective duty; Mexico $417M at 14.6% effective duty; South Korea $198M at 25.4% effective duty; Vietnam $198M at 17.5% effective duty; India $188M at 7.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.