HTS Heading 7212
Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated
All 10 HTS codes under heading 7212 (flat-rolled products of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7212
- 7212 Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated.
- 7212.10.00.00 Plated or coated with tin (under: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated) (kg): General Free; Special none; Column 2 6%.
- 7212.20.00.00 Electrolytically plated or coated with zinc (kg): General Free; Special none; Column 2 21.5%.
- 7212.30 Otherwise plated or coated with zinc.
- 7212.30.10 Of a thickness exceeding 0.25 mm or more: General Free; Special none; Column 2 25%.
- 7212.30.10.30 Of a width less than 51 mm, in coils (kg).
- 7212.30.10.90 Other (under: Of a thickness exceeding 0.25 mm or more) (kg).
- 7212.30.30.00 Other (under: Of a width of less than 300 mm) (kg): General Free; Special none; Column 2 25%.
- 7212.30.50.00 Other (under: Otherwise plated or coated with zinc) (kg): General Free; Special none; Column 2 21.5%.
- 7212.40 Painted, varnished or coated with plastics.
- 7212.40.10.00 Of a width of less than 300 mm (kg): General Free; Special none; Column 2 25%.
- 7212.40.50.00 Other (under: Painted, varnished or coated with plastics) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7212.50.00.00 Otherwise plated or coated (under: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated) (kg): General Free; Special none; Column 2 21.5%.
- 7212.60.00.00 Clad (under: Flat-rolled products of iron or nonalloy steel, of a width of less than 600 mm, clad, plated or coated) (kg): General Free; Special none; Column 2 30%.
From MFG Calcs data: Steel flat-rolled products
U.S. imports of steel flat-rolled products (headings 7208, 7209, 7210, 7211, 7212) came to $6.60B in 2025, with $1.58B in calculated duty: an effective duty of 23.9%, every duty included.
Effective duty in Sep 2026: 44.4%, against 41.2% in Sep 2025.
Largest sources in 2025: Canada $1.97B at 25.0% effective duty; South Korea $912M at 27.3% effective duty; Germany $769M at 17.8% effective duty; Taiwan $571M at 34.2% effective duty; Netherlands $473M at 19.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.