HTS Heading 7215
Other bars and rods of iron or nonalloy steel
All 12 HTS codes under heading 7215 (other bars and rods of iron or nonalloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7215
- 7215 Other bars and rods of iron or nonalloy steel.
- 7215.10.00 Of free-cutting steel, not further worked than cold-formed or cold-finished: General Free; Special none; Column 2 0.3¢/kg + 20%.
- 7215.10.00.10 Containing by weight 0.1 percent or more of lead (kg).
- 7215.10.00.80 Other (under: Of free-cutting steel, not further worked than cold-formed or cold-finished) (kg).
- 7215.50.00 Other, not further worked than cold-formed or cold-finished: General Free; Special none; Column 2 0.3¢/kg + 20%.
- 7215.50.00.16 With a diameter or cross section measuring less than 76 mm (kg).
- 7215.50.00.18 With a diameter or cross section measuring 76 mm or more but not exceeding 228 mm (kg).
- 7215.50.00.20 With a diameter or cross section exceeding 228 mm (kg).
- 7215.50.00.61 With a diameter or cross section measuring less than 76 mm (kg).
- 7215.50.00.63 With a diameter or cross section measuring 76 mm or more but not exceeding 228 mm (kg).
- 7215.50.00.65 With a diameter or cross section exceeding 228 mm (kg).
- 7215.50.00.90 Containing by weight 0.6 percent or more of carbon (kg).
- 7215.90 Other (under: Other bars and rods of iron or nonalloy steel).
- 7215.90.10.00 Not cold-formed (under: Plated or coated with metal) (kg): General Free; Special none; Column 2 0.4¢/kg + 20%.
- 7215.90.30.00 Cold-formed (under: Plated or coated with metal) (kg): General Free; Special none; Column 2 0.3¢/kg + 20%.
- 7215.90.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 0.3¢/kg + 20%.
From MFG Calcs data: Steel bar, rod, and wire
U.S. imports of steel bar, rod, and wire (headings 7213, 7214, 7215, 7216, 7217) came to $2.93B in 2025, with $647M in calculated duty: an effective duty of 22.1%, every duty included.
Effective duty in Sep 2026: 35.4%, against 34.8% in Sep 2025.
Largest sources in 2025: Canada $579M at 19.8% effective duty; Mexico $417M at 14.6% effective duty; South Korea $198M at 25.4% effective duty; Vietnam $198M at 17.5% effective duty; India $188M at 7.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.