HTS Heading 7216

Angles, shapes and sections of iron or nonalloy steel

All 18 HTS codes under heading 7216 (angles), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7216

  • 7216 Angles, shapes and sections of iron or nonalloy steel.
  • 7216.10.00 U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of less than 80 mm: General Free; Special none; Column 2 2%.
  • 7216.10.00.10 U sections (under: U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of less than 80 mm) (kg).
  • 7216.10.00.50 Other (under: U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of less than 80 mm) (kg).
  • 7216.21.00.00 L sections (under: L or T sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of less than 80 mm) (kg): General Free; Special none; Column 2 2%.
  • 7216.22.00.00 T sections (under: L or T sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of less than 80 mm) (kg): General Free; Special none; Column 2 2%.
  • 7216.31.00.00 U sections (under: U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more) (kg): General Free; Special none; Column 2 2%.
  • 7216.32.00.00 I sections (standard beams) (under: U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more) (kg): General Free; Special none; Column 2 2%.
  • 7216.33.00 H sections (under: U, I or H sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more): General Free; Special none; Column 2 2%.
  • 7216.33.00.30 Weighing not more than 11.3 kg per 30.5 cm, with a web depth measuring 102 mm to 356 mm (kg).
  • 7216.33.00.60 Weighing more than 11.3 kg but not more than 27.2 kg per 30.5 cm, with a web depth measuring 203 mm to 457 mm (kg).
  • 7216.33.00.90 Other (under: H sections) (kg).
  • 7216.40.00 L or T sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more: General Free; Special none; Column 2 2%.
  • 7216.40.00.10 L sections (under: L or T sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more) (kg).
  • 7216.40.00.50 Other (under: L or T sections, not further worked than hot-rolled, hot-drawn or extruded, of a height of 80 mm or more) (kg).
  • 7216.50.00.00 Other angles, shapes and sections, not further worked than hot-rolled, hot-drawn or extruded (kg): General Free; Special none; Column 2 2%.
  • 7216.61.00.00 Obtained from flat-rolled products (kg): General Free; Special none; Column 2 20%.
  • 7216.69.00.00 Other (under: Angles, shapes and sections, not further worked than cold-formed or cold-finished) (kg): General Free; Special none; Column 2 20%.
  • 7216.91.00 Cold-formed or cold-finished from flat-rolled products: General Free; Special none; Column 2 20%.
  • 7216.91.00.10 Drilled, notched, punched or cambered (kg).
  • 7216.91.00.90 Other (under: Cold-formed or cold-finished from flat-rolled products) (kg).
  • 7216.99.00 Other (under: Other): General Free; Special none; Column 2 20%.
  • 7216.99.00.10 Drilled, notched, punched or cambered (kg).
  • 7216.99.00.90 Other (under: Other) (kg).

From MFG Calcs data: Steel bar, rod, and wire

U.S. imports of steel bar, rod, and wire (headings 7213, 7214, 7215, 7216, 7217) came to $2.93B in 2025, with $647M in calculated duty: an effective duty of 22.1%, every duty included.

Effective duty in Sep 2026: 35.4%, against 34.8% in Sep 2025.

Largest sources in 2025: Canada $579M at 19.8% effective duty; Mexico $417M at 14.6% effective duty; South Korea $198M at 25.4% effective duty; Vietnam $198M at 17.5% effective duty; India $188M at 7.8% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.