HTS Heading 7220

Flat-rolled products of stainless steel, of a width of less than 600 mm

All 24 HTS codes under heading 7220 (flat-rolled products of stainless steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7220

  • 7220 Flat-rolled products of stainless steel, of a width of less than 600 mm.
  • 7220.11.00.00 Of a thickness of 4.75 mm or more (kg): General Free; Special none; Column 2 29%.
  • 7220.12 Of a thickness of less than 4.75 mm.
  • 7220.12.10.00 Of a width of 300 mm or more (under: Of a thickness of less than 4.75 mm) (kg): General Free; Special none; Column 2 29%.
  • 7220.12.50.00 Of a width of less than 300 mm (kg): General Free; Special none; Column 2 34%.
  • 7220.20 Not further worked than cold-rolled (cold-reduced).
  • 7220.20.10 Of a width of 300 mm or more (under: Not further worked than cold-rolled (cold-reduced)): General Free; Special none; Column 2 29%.
  • 7220.20.10.10 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7220.20.10.15 Other (under: Containing more than 0.5 percent but less than 24 percent by weight of nickel) (kg).
  • 7220.20.10.60 Containing less than 15 percent by weight of chromium (kg).
  • 7220.20.10.80 Other (under: Other) (kg).
  • 7220.20.60 Of a thickness exceeding 1.25 mm: General Free; Special none; Column 2 34%.
  • 7220.20.60.05 Of high-nickel alloy steel (under: Of a thickness exceeding 1.25 mm) (kg).
  • 7220.20.60.10 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7220.20.60.15 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
  • 7220.20.60.60 Containing less than 15 percent by weight of chromium (kg).
  • 7220.20.60.80 Other (under: Other) (kg).
  • 7220.20.70 Of a thickness exceeding 0.25 mm but not exceeding 1.25 mm: General Free; Special none; Column 2 34%.
  • 7220.20.70.05 Of high-nickel alloy steel (under: Of a thickness exceeding 0.25 mm but not exceeding 1.25 mm) (kg).
  • 7220.20.70.10 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7220.20.70.15 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
  • 7220.20.70.60 Containing less than 15 percent by weight of chromium (kg).
  • 7220.20.70.80 Other (under: Other) (kg).
  • 7220.20.80.00 Razor blade steel (under: Of a thickness not exceeding 0.25 mm) (kg): General Free; Special none; Column 2 34%.
  • 7220.20.90 Other (under: Of a thickness not exceeding 0.25 mm): General Free; Special none; Column 2 34%.
  • 7220.20.90.30 Containing more than 0.5 percent but less than 24 percent by weight of nickel (kg).
  • 7220.20.90.60 Other (under: Other) (kg).
  • 7220.90.00 Other (under: Flat-rolled products of stainless steel, of a width of less than 600 mm): General Free; Special none; Column 2 46%.
  • 7220.90.00.10 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7220.90.00.15 Other (under: Containing more than 0.5 percent but less than 24 percent by weight of nickel) (kg).
  • 7220.90.00.60 Containing less than 15 percent by weight of chromium (kg).
  • 7220.90.00.80 Other (under: Other) (kg).

From MFG Calcs data: Stainless steel mill products

U.S. imports of stainless steel mill products (headings 7219, 7220, 7221, 7222, 7223) came to $2.07B in 2025, with $538M in calculated duty: an effective duty of 26.0%, every duty included.

Effective duty in Sep 2026: 43.8%, against 39.2% in Sep 2025.

Largest sources in 2025: Taiwan $354M at 30.8% effective duty; Italy $236M at 20.3% effective duty; India $222M at 28.6% effective duty; Sweden $120M at 29.0% effective duty; Germany $119M at 22.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.