HTS Heading 7219
Flat-rolled products of stainless steel, of a width of 600 mm or more
All 76 HTS codes under heading 7219 (flat-rolled products of stainless steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7219
- 7219 Flat-rolled products of stainless steel, of a width of 600 mm or more.
- 7219.11.00 Of a thickness exceeding 10 mm: General Free; Special none; Column 2 29%.
- 7219.11.00.30 Of a width not exceeding 1575 mm (kg).
- 7219.11.00.60 Of a width exceeding 1575 mm (under: Of a thickness exceeding 10 mm) (kg).
- 7219.12.00 Of a thickness of 4.75 mm or more but not exceeding 10 mm: General Free; Special none; Column 2 29%.
- 7219.12.00.02 Not annealed or not pickled (under: Of a thickness of 4.75 mm or more but not exceeding 10 mm) (kg).
- 7219.12.00.06 Of high-nickel alloy steel (under: Other) (kg).
- 7219.12.00.21 Of a width not exceeding 1575 mm (kg).
- 7219.12.00.26 Of a width exceeding 1575 mm (under: Of a thickness exceeding 6.8 mm) (kg).
- 7219.12.00.51 Of a width not exceeding 1575 mm (kg).
- 7219.12.00.56 Of a width exceeding 1575 mm (under: Other) (kg).
- 7219.12.00.66 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.12.00.71 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
- 7219.12.00.81 Other (under: Other) (kg).
- 7219.13.00 Of a thickness of 3 mm or more but less than 4.75 mm: General Free; Special none; Column 2 29%.
- 7219.13.00.02 Not annealed or not pickled (under: Of a thickness of 3 mm or more but less than 4.75 mm) (kg).
- 7219.13.00.31 Of a width of 1370 mm or more (kg).
- 7219.13.00.51 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.13.00.71 Other (under: Containing more than 0.5 percent but less than 24 percent by weight of nickel) (kg).
- 7219.13.00.81 Other (under: Other) (kg).
- 7219.14.00 Of a thickness of less than 3 mm: General Free; Special none; Column 2 29%.
- 7219.14.00.30 Of a width of 1370 mm or more (kg).
- 7219.14.00.65 Of high-nickel alloy steel (under: Other) (kg).
- 7219.14.00.90 Other (under: Other) (kg).
- 7219.21.00 Of a thickness exceeding 10 mm: General Free; Special none; Column 2 29%.
- 7219.21.00.05 Of high-nickel alloy steel (under: Of a thickness exceeding 10 mm) (kg).
- 7219.21.00.20 Of a width not exceeding 1575 mm (kg).
- 7219.21.00.40 Of a width exceeding 1575 mm but not exceeding 1880 mm (kg).
- 7219.21.00.60 Of a width exceeding 1880 mm (under: Other) (kg).
- 7219.22.00 Of a thickness of 4.75 mm or more but not exceeding 10 mm: General Free; Special none; Column 2 29%.
- 7219.22.00.05 Of high-nickel alloy steel (under: Of a thickness of 4.75 mm or more but not exceeding 10 mm) (kg).
- 7219.22.00.15 Of a width not exceeding 1575 mm (kg).
- 7219.22.00.20 Of a width exceeding 1575 mm but not exceeding 1880 mm (kg).
- 7219.22.00.25 Of a width exceeding 1880 mm (under: Containing more than 1.5 percent but less than 5 percent by weight of molybdenum) (kg).
- 7219.22.00.35 Of a width not exceeding 1575 mm (kg).
- 7219.22.00.40 Of a width exceeding 1575 mm but not exceeding 1880 mm (kg).
- 7219.22.00.45 Of a width exceeding 1880 mm (under: Other) (kg).
- 7219.22.00.70 Of a width not exceeding 1575 mm (kg).
- 7219.22.00.75 Of a width exceeding 1575 mm but not exceeding 1880 mm (kg).
- 7219.22.00.80 Of a width exceeding 1880 mm (under: Other) (kg).
- 7219.23.00 Of a thickness of 3 mm or more but less than 4.75 mm: General Free; Special none; Column 2 29%.
- 7219.23.00.30 Of a width of 1370 mm or more (kg).
- 7219.23.00.60 Other (under: Of a thickness of 3 mm or more but less than 4.75 mm) (kg).
- 7219.24.00 Of a thickness of less than 3 mm: General Free; Special none; Column 2 29%.
- 7219.24.00.30 Of a width of 1370 mm or more (kg).
- 7219.24.00.60 Other (under: Of a thickness of less than 3 mm) (kg).
- 7219.31.00 Of a thickness of 4.75 mm or more: General Free; Special none; Column 2 29%.
- 7219.31.00.10 In coils (under: Of a thickness of 4.75 mm or more) (kg).
- 7219.31.00.50 Not in coils (under: Of a thickness of 4.75 mm or more) (kg).
- 7219.32.00 Of a thickness of 3 mm or more but less than 4.75 mm: General Free; Special none; Column 2 29%.
- 7219.32.00.05 Of high-nickel alloy steel (under: Of a width of 1370 mm or more) (kg).
- 7219.32.00.20 Containing more than 0.5 percent by weight of nickel (kg).
- 7219.32.00.25 Other (under: Other) (kg).
- 7219.32.00.35 Of high-nickel alloy steel (under: Other) (kg).
- 7219.32.00.36 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.32.00.38 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
- 7219.32.00.42 Containing less than 15 percent by weight of chromium (kg).
- 7219.32.00.44 Other (under: Other) (kg).
- 7219.32.00.45 Of a width of 1370 mm or more (kg).
- 7219.32.00.60 Other (under: Not in coils) (kg).
- 7219.33.00 Of a thickness exceeding 1 mm but less than 3 mm: General Free; Special none; Column 2 29%.
- 7219.33.00.05 Of high-nickel alloy steel (under: Of a width of 1370 mm or more) (kg).
- 7219.33.00.20 Containing more than 0.5 percent by weight of nickel (kg).
- 7219.33.00.25 Other (under: Other) (kg).
- 7219.33.00.35 Of high-nickel alloy steel (under: Other) (kg).
- 7219.33.00.36 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.33.00.38 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
- 7219.33.00.42 Containing less than 15 percent by weight of chromium (kg).
- 7219.33.00.44 Other (under: Other) (kg).
- 7219.33.00.45 Of a width of 1370 mm or more (kg).
- 7219.33.00.70 Containing more than 0.5 percent but less than 24 percent by weight of nickel (kg).
- 7219.33.00.80 Other (under: Other) (kg).
- 7219.34.00 Of a thickness of 0.5 mm or more but not exceeding 1 mm: General Free; Special none; Column 2 29%.
- 7219.34.00.05 Of high-nickel alloy steel (under: In coils) (kg).
- 7219.34.00.20 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.34.00.25 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
- 7219.34.00.30 Containing less than 15 percent by weight of chromium (kg).
- 7219.34.00.35 Other (under: Other) (kg).
- 7219.34.00.50 Not in coils (under: Of a thickness of 0.5 mm or more but not exceeding 1 mm) (kg).
- 7219.35.00 Of a thickness of less than 0.5 mm: General Free; Special none; Column 2 29%.
- 7219.35.00.05 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.35.00.15 Other (under: Containing more than 0.5 percent but less than 24 percent by weight of nickel) (kg).
- 7219.35.00.30 Containing less than 15 percent by weight of chromium (kg).
- 7219.35.00.35 Other (under: Other) (kg).
- 7219.35.00.50 Not in coils (under: Of a thickness of less than 0.5 mm) (kg).
- 7219.90.00 Other (under: Flat-rolled products of stainless steel, of a width of 600 mm or more): General Free; Special none; Column 2 29%.
- 7219.90.00.10 Of high-nickel alloy steel (under: Other) (kg).
- 7219.90.00.20 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
- 7219.90.00.25 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
- 7219.90.00.60 Containing less than 15 percent by weight of chromium (kg).
- 7219.90.00.80 Other (under: Other) (kg).
From MFG Calcs data: Stainless steel mill products
U.S. imports of stainless steel mill products (headings 7219, 7220, 7221, 7222, 7223) came to $2.07B in 2025, with $538M in calculated duty: an effective duty of 26.0%, every duty included.
Effective duty in Sep 2026: 43.8%, against 39.2% in Sep 2025.
Largest sources in 2025: Taiwan $354M at 30.8% effective duty; Italy $236M at 20.3% effective duty; India $222M at 28.6% effective duty; Sweden $120M at 29.0% effective duty; Germany $119M at 22.4% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.