HTS Heading 7222

Other bars and rods of stainless steel; angles, shapes and sections of stainless steel

All 31 HTS codes under heading 7222 (other bars and rods of stainless steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7222

  • 7222 Other bars and rods of stainless steel; angles, shapes and sections of stainless steel.
  • 7222.11.00 Of circular cross-section (under: Bars and rods, not further worked than hot-rolled, hot-drawn or extruded): General Free; Special none; Column 2 29%.
  • 7222.11.00.01 Electroslag or vacuum arc remelted (kg).
  • 7222.11.00.06 Of high-nickel alloy steel (under: Of circular cross-section) (kg).
  • 7222.11.00.57 Containing less than 8 percent by weight of nickel (kg).
  • 7222.11.00.59 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.11.00.82 Containing less than 8 percent by weight of nickel (kg).
  • 7222.11.00.84 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.19.00 Other (under: Bars and rods, not further worked than hot-rolled, hot-drawn or extruded): General Free; Special none; Column 2 29%.
  • 7222.19.00.01 Electroslag or vacuum arc remelted (kg).
  • 7222.19.00.06 Of high-nickel alloy steel (under: Other) (kg).
  • 7222.19.00.52 Containing less than 8 percent by weight of nickel (kg).
  • 7222.19.00.54 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.20.00 Bars and rods, not further worked than cold-formed or cold-finished: General Free; Special none; Column 2 29%.
  • 7222.20.00.01 Electroslag or vacuum arc remelted (kg).
  • 7222.20.00.06 Of high-nickel alloy steel (under: Bars and rods, not further worked than cold-formed or cold-finished) (kg).
  • 7222.20.00.41 Containing less than 8 percent by weight of nickel (kg).
  • 7222.20.00.43 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.20.00.62 Containing less than 8 percent by weight of nickel (kg).
  • 7222.20.00.64 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.20.00.67 Containing less than 8 percent by weight of nickel (kg).
  • 7222.20.00.69 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.20.00.71 Containing less than 8 percent by weight of nickel (kg).
  • 7222.20.00.73 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.30.00 Other bars and rods (under: Other bars and rods of stainless steel; angles, shapes and sections of stainless steel): General Free; Special none; Column 2 29%.
  • 7222.30.00.01 Electroslag or vacuum arc remelted (kg).
  • 7222.30.00.12 Of high-nickel alloy steel (under: Other bars and rods) (kg).
  • 7222.30.00.22 Containing less than 8 percent by weight of nickel (kg).
  • 7222.30.00.24 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.30.00.82 Containing less than 8 percent by weight of nickel (kg).
  • 7222.30.00.84 Containing 8 percent or more but less than 24 percent by weight of nickel (kg).
  • 7222.40 Angles, shapes and sections (under: Other bars and rods of stainless steel; angles, shapes and sections of stainless steel).
  • 7222.40.30 Hot-rolled, not drilled, not punched and not otherwise advanced: General Free; Special none; Column 2 10%.
  • 7222.40.30.25 Angles (under: With a maximum cross-sectional dimension of 80 mm or more) (kg).
  • 7222.40.30.45 Other (under: With a maximum cross-sectional dimension of 80 mm or more) (kg).
  • 7222.40.30.65 Angles (under: With a maximum cross-sectional dimension of less than 80 mm) (kg).
  • 7222.40.30.85 Other (under: With a maximum cross-sectional dimension of less than 80 mm) (kg).
  • 7222.40.60.00 Other (under: Angles, shapes and sections) (kg): General Free; Special none; Column 2 28%.

From MFG Calcs data: Stainless steel mill products

U.S. imports of stainless steel mill products (headings 7219, 7220, 7221, 7222, 7223) came to $2.07B in 2025, with $538M in calculated duty: an effective duty of 26.0%, every duty included.

Effective duty in Sep 2026: 43.8%, against 39.2% in Sep 2025.

Largest sources in 2025: Taiwan $354M at 30.8% effective duty; Italy $236M at 20.3% effective duty; India $222M at 28.6% effective duty; Sweden $120M at 29.0% effective duty; Germany $119M at 22.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.