HTS Heading 7223
Wire of stainless steel
All 8 HTS codes under heading 7223 (wire of stainless steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7223
- 7223.00 Wire of stainless steel.
- 7223.00.10 Round wire (under: Wire of stainless steel): General Free; Special none; Column 2 34%.
- 7223.00.10.05 Spring round wire of a kind described in statistical note 8 to this chapter (kg).
- 7223.00.10.16 With a diameter of less than 0.25 mm (kg).
- 7223.00.10.31 With a diameter of 0.25 mm or more but less than 0.76 mm (kg).
- 7223.00.10.46 With a diameter of 0.76 mm or more but less than 1.52 mm (kg).
- 7223.00.10.61 With a diameter of 1.52 mm or more but less than 5.1 mm (kg).
- 7223.00.10.76 With a diameter of 5.1 mm or more (kg).
- 7223.00.50.00 Flat wire (under: Wire of stainless steel) (kg): General Free; Special none; Column 2 34%.
- 7223.00.90.00 Other (under: Wire of stainless steel) (kg): General Free; Special none; Column 2 34%.
From MFG Calcs data: Stainless steel mill products
U.S. imports of stainless steel mill products (headings 7219, 7220, 7221, 7222, 7223) came to $2.07B in 2025, with $538M in calculated duty: an effective duty of 26.0%, every duty included.
Effective duty in Sep 2026: 43.8%, against 39.2% in Sep 2025.
Largest sources in 2025: Taiwan $354M at 30.8% effective duty; Italy $236M at 20.3% effective duty; India $222M at 28.6% effective duty; Sweden $120M at 29.0% effective duty; Germany $119M at 22.4% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.