HTS Heading 7301

Sheet piling of iron or steel, whether or not drilled, punched or made from assembled elements; welded angles, shapes and sections, of iron or steel

All 3 HTS codes under heading 7301 (sheet piling of iron or steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7301

  • 7301 Sheet piling of iron or steel, whether or not drilled, punched or made from assembled elements; welded angles, shapes and sections, of iron or steel.
  • 7301.10.00.00 Sheet piling (under: Sheet piling of iron or steel, whether or not drilled, punched or made from assembled elements; welded angles, shapes and sections, of iron or steel) (kg): General Free; Special none; Column 2 2%.
  • 7301.20 Angles, shapes and sections (under: Sheet piling of iron or steel, whether or not drilled, punched or made from assembled elements; welded angles, shapes and sections, of iron or steel).
  • 7301.20.10.00 Of iron or nonalloy steel (under: Angles, shapes and sections) (kg): General Free; Special none; Column 2 20%.
  • 7301.20.50.00 Of alloy steel (under: Angles, shapes and sections) (kg): General Free; Special none; Column 2 28%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.