HTS Heading 7229

Wire of other alloy steel

All 11 HTS codes under heading 7229 (wire of other alloy steel), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7229

  • 7229 Wire of other alloy steel.
  • 7229.20.00 Of silico-manganese steel (under: Wire of other alloy steel): General Free; Special none; Column 2 33%.
  • 7229.20.00.10 Plated or coated with copper (under: Round, with a diameter of less than or equal to 1.6 mm, containing by weight less than 0.20 percent of carbon, more than 0.9 percent of manganese, and more than 0.6 percent of silicon, and suitable for electric arc welding) (kg).
  • 7229.20.00.15 Other (under: Round, with a diameter of less than or equal to 1.6 mm, containing by weight less than 0.20 percent of carbon, more than 0.9 percent of manganese, and more than 0.6 percent of silicon, and suitable for electric arc welding) (kg).
  • 7229.20.00.90 Other (under: Of silico-manganese steel) (kg).
  • 7229.90 Other (under: Wire of other alloy steel).
  • 7229.90.05.00 Of high-speed steel (under: Other) (kg): General Free; Special none; Column 2 37%.
  • 7229.90.10.00 Flat wire (under: Other) (kg): General Free; Special none; Column 2 33%.
  • 7229.90.50 Round wire (under: Other): General Free; Special none; Column 2 33%.
  • 7229.90.50.06 Plated or coated with copper (under: With a diameter of less than or equal to 1.6 mm, containing by weight less than 0.20 percent of carbon and more than 0.3 percent of nickel or more than 0.08 percent of molybdenum, and suitable for electric arc welding) (kg).
  • 7229.90.50.08 Other (under: With a diameter of less than or equal to 1.6 mm, containing by weight less than 0.20 percent of carbon and more than 0.3 percent of nickel or more than 0.08 percent of molybdenum, and suitable for electric arc welding) (kg).
  • 7229.90.50.16 With a diameter of less than 1.0 mm (kg).
  • 7229.90.50.31 With a diameter of 1.0 mm or more but less than 1.5 mm (kg).
  • 7229.90.50.51 With a diameter of 1.5 mm or more (kg).
  • 7229.90.90.00 Other wire (under: Other) (kg): General Free; Special none; Column 2 33%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.