HTS Heading 7314

Cloth (including endless bands), grill, netting and fencing, of iron or steel wire; expanded metal of iron or steel

All 25 HTS codes under heading 7314 (cloth (including endless bands), grill), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7314

  • 7314 Cloth (including endless bands), grill, netting and fencing, of iron or steel wire; expanded metal of iron or steel.
  • 7314.12 Endless bands for machinery, of stainless steel.
  • 7314.12.10.00 With meshes not finer than 12 wires to the lineal centimeter in warp or filling (m2, kg): General Free; Special none; Column 2 35%.
  • 7314.12.20.00 With meshes finer than 12 but not finer than 36 wires to the lineal centimeter in warp or filling (m2, kg): General Free; Special none; Column 2 50%.
  • 7314.12.30.00 With 94 or more wires to the lineal centimeter (m2, kg): General Free; Special none; Column 2 75%.
  • 7314.12.60.00 Other (under: Fourdrinier wires, seamed or not seamed, suitable for use in papermaking machines) (m2, kg): General Free; Special none; Column 2 75%.
  • 7314.12.90.00 Other (under: With meshes finer than 36 wires to the lineal centimeter in warp or filling) (m2, kg): General Free; Special none; Column 2 60%.
  • 7314.14 Other woven cloth, of stainless steel.
  • 7314.14.10.00 With meshes not finer than 12 wires to the lineal centimeter in warp or filling (m2, kg): General Free; Special none; Column 2 35%.
  • 7314.14.20.00 With meshes finer than 12 but not finer than 36 wires to the lineal centimeter in warp or filling (m2, kg): General Free; Special none; Column 2 50%.
  • 7314.14.30.00 With 94 or more wires to the lineal centimeter (m2, kg): General Free; Special none; Column 2 75%.
  • 7314.14.60.00 Other (under: Fourdrinier wires, seamed or not seamed, suitable for use in papermaking machines) (m2, kg): General Free; Special none; Column 2 75%.
  • 7314.14.90.00 Other (under: With meshes finer than 36 wires to the lineal centimeter in warp or maximum) (m2, kg): General Free; Special none; Column 2 60%.
  • 7314.19.01.00 Other (under: Woven cloth) (m2, kg): General Free; Special none; Column 2 60%.
  • 7314.20.00.00 Grill, netting and fencing, welded at the intersection, of wire with a maximum cross-sectional dimension of 3 mm or more and having a mesh size of 100 cm2 or more (kg): General Free; Special none; Column 2 45%.
  • 7314.31 Plated or coated with zinc (under: Other grill, netting and fencing, welded at the intersection).
  • 7314.31.10.00 Wire fencing plated or coated with zinc, whether or not covered with plastic material (kg): General Free; Special none; Column 2 1.1¢/kg.
  • 7314.31.50 Other (under: Plated or coated with zinc): General Free; Special none; Column 2 45%.
  • 7314.31.50.10 Welded wire stucco netting, furred, not reinforced with supplemental horizontal wire (kg).
  • 7314.31.50.80 Other (under: Other) (kg).
  • 7314.39.00.00 Other (under: Other grill, netting and fencing, welded at the intersection) (kg): General Free; Special none; Column 2 45%.
  • 7314.41.00 Plated or coated with zinc (under: Other grill, netting and fencing): General Free; Special none; Column 2 1.1¢/kg.
  • 7314.41.00.30 Chain link fencing (under: Plated or coated with zinc) (kg).
  • 7314.41.00.40 Of wire with maximum cross- sectional dimension of 1 mm (kg).
  • 7314.41.00.45 Other (under: Woven wire stucco netting, furred, not reinforced with supplemental horizontal wire) (kg).
  • 7314.41.00.80 Other (under: Plated or coated with zinc) (kg).
  • 7314.42.00 Coated with plastics (under: Other grill, netting and fencing): General Free; Special none; Column 2 1.1¢/kg.
  • 7314.42.00.30 Chain link fencing (under: Coated with plastics) (kg).
  • 7314.42.00.60 Other (under: Coated with plastics) (kg).
  • 7314.49 Other (under: Other grill, netting and fencing).
  • 7314.49.30.00 Not cut to shape (under: Other) (kg): General Free; Special none; Column 2 45%.
  • 7314.49.60.00 Cut to shape (under: Other) (kg): General Free; Special none; Column 2 35%.
  • 7314.50.00.00 Expanded metal (under: Cloth (including endless bands), grill, netting and fencing, of iron or steel wire; expanded metal of iron or steel) (m2, kg): General Free; Special none; Column 2 45%.

From MFG Calcs data: Springs, chain, and wire mesh

U.S. imports of springs, chain, and wire mesh (headings 7314, 7315, 7320) came to $2.27B in 2025, with $699M in calculated duty: an effective duty of 30.8%, every duty included.

Effective duty in Sep 2026: 33.8%, against 42.2% in Sep 2025.

Largest sources in 2025: Mexico $801M at 18.8% effective duty; China $398M at 63.8% effective duty; Germany $188M at 30.8% effective duty; Japan $186M at 28.3% effective duty; Canada $178M at 21.2% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.