Sourcing Signal

Springs, chain, and wire mesh: Import Burden by Source Country

Compare observed duty-and-freight burdens for source countries supplying springs, chain, and wire mesh, from USITC DataWeb. Dollar landed-cost rankings appear only when at least two lanes have complete country-specific customs unit values.

How to read this

  • Duty and international freight are additive shares of customs value: uplift = 1 + duty + freight. Missing components stay unknown; duty is not compounded onto freight.
  • No comparative dollar ranking is shown unless at least two lanes have their own customs unit value, duty, and freight inputs. Complete burdens may still be compared without calling the lowest one a cheapest supplier.
  • The FX tag is a short-window cost direction from the currency's recent drift, not a dollar recompute.

Source-country duty-and-freight burdens (unranked)

  • null. Mexico: 19.83% loaded (duty 18.79%, freight 1.04%), MXN trending cheaper
  • null. Canada: 22.93% loaded (duty 21.16%, freight 1.77%), CAD trending flat
  • null. Italy: 30.05% loaded (duty 26.66%, freight 3.39%), EUR trending cheaper
  • null. Japan: 31.6% loaded (duty 28.3%, freight 3.3%), JPY trending cheaper
  • null. Vietnam: 34.3% loaded (duty 23.12%, freight 11.18%)
  • null. Germany: 34.48% loaded (duty 30.84%, freight 3.64%), EUR trending cheaper
  • null. Taiwan: 37.29% loaded (duty 31.85%, freight 5.44%)
  • null. India: 37.31% loaded (duty 30.28%, freight 7.03%)
  • null. Poland: 38.3% loaded (duty 35.43%, freight 2.87%)
  • null. China: 75.29% loaded (duty 63.82%, freight 11.47%), CNY trending flat

Sourcing concentration

  • Mexico is the largest retained source at 35.3% of total family import customs value. Retained sources cover 87.4%; their named-source HHI floor is 1770, which falls in the moderately concentrated range without classifying the omitted-source tail.

Frequently asked questions

  • Why is there no dollar landed cost for springs, chain, and wire mesh? No complete country-specific customs unit value is available for this family in the committed snapshot. The page compares observed duty-and-freight burdens but does not rank lanes until at least two have reported quantity, duty, and freight data.
  • How concentrated is sourcing of springs, chain, and wire mesh? Mexico is the largest retained source at 35.3% of total family import customs value. Retained sources cover 87.4% of family import customs value, so the named-source Herfindahl index of 1770 is a lower bound; its floor falls in the moderately concentrated band but does not classify the omitted-source tail. A concentrated map means fewer places to move volume if one lane's duty jumps.

About this data

  • A sourcing-comparison indicator, not a customs quote. Duty and international freight are added over customs value; duty is not compounded onto freight. Lanes are ranked by modeled landed customs unit value only when at least two have their own reported customs unit value, duty, and freight. Missing or suppressed quantity data remains unknown. FX is a direction, not a recompute. Confirm classification and entry costs with a licensed broker.

Last reviewed 2026-10-08.