HTS Heading 7315
Chain and parts thereof, of iron or steel
All 20 HTS codes under heading 7315 (chain and parts thereof, of iron or steel), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 7315
- 7315 Chain and parts thereof, of iron or steel.
- 7315.11.00 Roller chain (under: Articulated link chain and parts thereof): General Free; Special none; Column 2 40%.
- 7315.11.00.05 For motor vehicles (under: Roller chain) (kg).
- 7315.11.00.10 Bicycle chains (under: Of not over 50 mm pitch and containing more than 3 parts per pitch) (kg).
- 7315.11.00.45 Other (under: Of not over 50 mm pitch and containing more than 3 parts per pitch) (kg).
- 7315.11.00.60 Other (under: Other) (kg).
- 7315.12.00 Other chain (under: Articulated link chain and parts thereof): General Free; Special none; Column 2 40%.
- 7315.12.00.20 Of not over 50 mm pitch and containing more than 3 parts per pitch (kg).
- 7315.12.00.40 Welded steel chain (under: Other) (kg).
- 7315.12.00.60 Cast and combination chain (under: Other) (kg).
- 7315.12.00.80 Other (under: Other) (kg).
- 7315.19.00.00 Parts (under: Articulated link chain and parts thereof) (kg): General Free; Special none; Column 2 40%.
- 7315.20 Skid chain (under: Chain and parts thereof, of iron or steel).
- 7315.20.10.00 Not over 8 mm in diameter (under: Skid chain) (kg): General Free; Special none; Column 2 10%.
- 7315.20.50.00 Over 8 mm in diameter (under: Skid chain) (kg): General Free; Special none; Column 2 2.5¢/kg.
- 7315.81.00.00 Stud link (under: Other chain) (kg): General Free; Special none; Column 2 4.4¢/kg.
- 7315.82 Other, welded link (under: Other chain).
- 7315.82.10.00 Not over 10 mm in diameter (under: Of alloy steel) (kg): General Free; Special none; Column 2 10%.
- 7315.82.30.00 Over 10 mm in diameter (under: Of alloy steel) (kg): General Free; Special none; Column 2 10%.
- 7315.82.50.00 Not over 10 mm in diameter (under: Of iron or nonalloy steel) (kg): General Free; Special none; Column 2 10%.
- 7315.82.70.00 Over 10 mm in diameter (under: Of iron or nonalloy steel) (kg): General Free; Special none; Column 2 10%.
- 7315.89 Other (under: Other chain).
- 7315.89.10.00 Not over 8 mm in diameter (under: With links of essentially round cross sections) (kg): General 1.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7315.89.30.00 Over 8 mm in diameter (under: With links of essentially round cross sections) (kg): General Free; Special none; Column 2 4.7¢/kg.
- 7315.89.50.00 Other (under: Other) (kg): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7315.90.00.00 Other parts (under: Chain and parts thereof, of iron or steel) (kg): General 2.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
From MFG Calcs data: Springs, chain, and wire mesh
U.S. imports of springs, chain, and wire mesh (headings 7314, 7315, 7320) came to $2.27B in 2025, with $699M in calculated duty: an effective duty of 30.8%, every duty included.
Effective duty in Sep 2026: 33.8%, against 42.2% in Sep 2025.
Largest sources in 2025: Mexico $801M at 18.8% effective duty; China $398M at 63.8% effective duty; Germany $188M at 30.8% effective duty; Japan $186M at 28.3% effective duty; Canada $178M at 21.2% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.