HTS Heading 7406

Copper powders and flakes

All 2 HTS codes under heading 7406 (copper powders and flakes), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7406

  • 7406 Copper powders and flakes.
  • 7406.10.00.00 Powders of non-lamellar structure (kg): General Free; Special none; Column 2 49%.
  • 7406.20.00.00 Powders of lamellar structure; flakes (kg): General Free; Special none; Column 2 12%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.