HTS Heading 7407

Copper bars, rods and profiles

All 15 HTS codes under heading 7407 (copper bars, rods and profiles), with their duty rates from the 2026 HTS Revision 23. General duty 1% to 3%.

Every line of heading 7407

  • 7407 Copper bars, rods and profiles.
  • 7407.10 Of refined copper (under: Copper bars, rods and profiles).
  • 7407.10.15.00 Hollow profiles (under: Profiles) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.10.30.00 Other (under: Profiles) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.10.50 Bars and rods (under: Of refined copper): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7%.
  • 7407.10.50.10 Having a rectangular cross section (kg).
  • 7407.10.50.50 Other (under: Bars and rods) (kg).
  • 7407.21 Of copper-zinc base alloys (brass).
  • 7407.21.15.00 Hollow profiles (under: Profiles) (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17%.
  • 7407.21.30.00 Other (under: Profiles) (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 17%.
  • 7407.21.50.00 Low fuming brazing rods (under: Bars and rods) (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7407.21.70.00 Having a rectangular cross section (kg): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7407.21.90.00 Other (under: Other) (kg): General 2.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.
  • 7407.29 Other (under: Of copper alloys).
  • 7407.29.16 Hollow (under: Profiles): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.29.16.10 Of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel silver) (kg).
  • 7407.29.16.80 Other (under: Hollow) (kg).
  • 7407.29.34.00 Of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel silver) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.29.38.00 Other (under: Other) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.29.40.00 Bars and rods of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel silver) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48%.
  • 7407.29.50.00 Other bars and rods (under: Other) (kg): General 1.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9%.

From MFG Calcs data: Copper semi-finished products

U.S. imports of copper semi-finished products (headings 7407, 7408, 7409, 7410, 7411) came to $5.36B in 2025, with $580M in calculated duty: an effective duty of 10.8%, every duty included.

Effective duty in Sep 2026: 41.3%, against 42.3% in Sep 2025.

Largest sources in 2025: Canada $1.38B at 2.6% effective duty; Germany $632M at 13.9% effective duty; South Korea $454M at 14.1% effective duty; Peru $418M at 12.7% effective duty; Mexico $327M at 9.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.