HTS Heading 7412

Copper tube or pipe fittings (for example couplings, elbows, sleeves)

All 8 HTS codes under heading 7412 (copper tube or pipe fittings), with their duty rates from the 2026 HTS Revision 23. General duty 3%.

Every line of heading 7412

  • 7412 Copper tube or pipe fittings (for example couplings, elbows, sleeves).
  • 7412.10.00.00 Of refined copper (under: Copper tube or pipe fittings (for example couplings, elbows, sleeves)) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 46%.
  • 7412.20.00 Of copper alloys (under: Copper tube or pipe fittings (for example couplings, elbows, sleeves)): General 3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
  • 7412.20.00.15 For brake hoses for vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, or 8705 (kg).
  • 7412.20.00.25 Nipples (under: Threaded) (kg).
  • 7412.20.00.35 Other (under: Threaded) (kg).
  • 7412.20.00.45 Other (under: Of copper-zinc base alloys (brass)) (kg).
  • 7412.20.00.65 Nipples (under: Threaded) (kg).
  • 7412.20.00.85 Other (under: Threaded) (kg).
  • 7412.20.00.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.