HTS Heading 7413
Stranded wire, cables, plaited bands and the like, including slings and similar articles, of copper, not electrically insulated
All 3 HTS codes under heading 7413 (stranded wire, cables), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 3%.
Every line of heading 7413
- 7413.00 Stranded wire, cables, plaited bands and the like, including slings and similar articles, of copper, not electrically insulated.
- 7413.00.10.00 Stranded wire (under: Not fitted with fittings and not made up into articles) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7413.00.50.00 Other (under: Not fitted with fittings and not made up into articles) (kg): General 2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7413.00.90.00 Fitted with fittings or made up into articles (kg): General 3%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.