HTS Heading 7411
Copper tubes and pipes
All 8 HTS codes under heading 7411 (copper tubes and pipes), with their duty rates from the 2026 HTS Revision 23. General duty 1.4% to 3%.
Every line of heading 7411
- 7411 Copper tubes and pipes.
- 7411.10 Of refined copper (under: Copper tubes and pipes).
- 7411.10.10 Seamless (under: Of refined copper): General 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13%.
- 7411.10.10.30 Having an outside diameter of 6 mm or more but not exceeding 16 mm, in coils on spools (kg).
- 7411.10.10.90 Other (under: Seamless) (kg).
- 7411.10.50.00 Other (under: Of refined copper) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 47%.
- 7411.21 Of copper-zinc base alloys (brass).
- 7411.21.10.00 Seamless (under: Of copper-zinc base alloys (brass)) (kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7411.21.50.00 Other (under: Of copper-zinc base alloys (brass)) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
- 7411.22.00.00 Of copper-nickel base alloys (cupro-nickel) or copper-nickel-zinc base alloys (nickel-silver) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 47%.
- 7411.29 Other (under: Of copper alloys).
- 7411.29.10.00 Seamless (under: Other) (kg): General 1.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7411.29.50.00 Other (under: Other) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 49%.
From MFG Calcs data: Copper semi-finished products
U.S. imports of copper semi-finished products (headings 7407, 7408, 7409, 7410, 7411) came to $5.36B in 2025, with $580M in calculated duty: an effective duty of 10.8%, every duty included.
Effective duty in Sep 2026: 41.3%, against 42.3% in Sep 2025.
Largest sources in 2025: Canada $1.38B at 2.6% effective duty; Germany $632M at 13.9% effective duty; South Korea $454M at 14.1% effective duty; Peru $418M at 12.7% effective duty; Mexico $327M at 9.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.