HTS Heading 7415

Nails, tacks, drawing pins, staples (other than those of heading 8305) and similar articles, of copper or of iron or steel with heads of copper; screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers (including spring washers) and similar articles, of copper

All 8 HTS codes under heading 7415 (nails, tacks, drawing pins), with their duty rates from the 2026 HTS Revision 23. General duty 1.4% to 3%.

Every line of heading 7415

  • 7415 Nails, tacks, drawing pins, staples (other than those of heading 8305) and similar articles, of copper or of iron or steel with heads of copper; screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers (including spring washers) and similar articles, of copper.
  • 7415.10.00.00 Nails and tacks, drawing pins, staples and similar articles (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7415.21.00.00 Washers (including spring washers) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7415.29.00.00 Other (under: Other articles, not threaded) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7415.33 Screws, bolts and nuts (under: Other threaded articles).
  • 7415.33.05.00 Screws for wood (under: Screws, bolts and nuts) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7415.33.10.00 Muntz or yellow metal bolts (under: Screws, bolts and nuts) (kg): General 1.4%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7%.
  • 7415.33.80 Other screws and bolts; nuts (under: Screws, bolts and nuts): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7415.33.80.10 Having shanks, threads or holes 6 mm or more in diameter (kg).
  • 7415.33.80.50 Having shanks, threads or holes less than 6 mm in diameter (kg).
  • 7415.39.00.00 Other (under: Other threaded articles) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.