HTS Heading 7418

Table, kitchen or other household articles and parts thereof, of copper; pot scourers and scouring or polishing pads, gloves and the like, of copper; sanitary ware and parts thereof, of copper

All 11 HTS codes under heading 7418 (table), with their duty rates from the 2026 HTS Revision 23. General duty 3%.

Every line of heading 7418

  • 7418 Table, kitchen or other household articles and parts thereof, of copper; pot scourers and scouring or polishing pads, gloves and the like, of copper; sanitary ware and parts thereof, of copper.
  • 7418.10.00 Table, kitchen or other household articles and parts thereof; pot scourers and scouring or polishing pads, gloves and the like: General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 7418.10.00.02 Of copper-zinc base alloys (brass) (kg).
  • 7418.10.00.04 Other (under: Pot scourers and scouring or polishing pads, gloves and the like) (kg).
  • 7418.10.00.19 Coated or plated with precious metals (kg).
  • 7418.10.00.21 Cooking or heating apparatus of a kind used for domestic purposes, non- electric and parts thereof (kg).
  • 7418.10.00.23 Cooking and kitchen ware (under: Of copper-zinc base alloys (brass)) (kg).
  • 7418.10.00.25 Other (under: Of copper-zinc base alloys (brass)) (kg).
  • 7418.10.00.51 Cooking or heating apparatus of a kind used for domestic purposes, non- electric and parts thereof (kg).
  • 7418.10.00.53 Cooking and kitchen ware (under: Other) (No., kg).
  • 7418.10.00.55 Other (under: Other) (kg).
  • 7418.20 Sanitary ware and parts thereof.
  • 7418.20.10.00 Of copper-zinc base alloys (brass) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 7418.20.50.00 Other (under: Sanitary ware and parts thereof) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.