HTS Heading 7419
Other articles of copper
All 12 HTS codes under heading 7419 (other articles of copper), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 7419
- 7419 Other articles of copper.
- 7419.20.00 Cast, molded, stamped or forged, but not further worked: General Free; Special none; Column 2 46%.
- 7419.20.00.10 Brass plumbing goods, not elsewhere specified or included (kg).
- 7419.20.00.50 Other (under: Cast, molded, stamped or forged, but not further worked) (kg).
- 7419.80 Other (under: Other articles of copper).
- 7419.80.03.00 Fourdrinier wires, seamed or not seamed, suitable for use in papermaking machines, with 94 or more wires to the lineal centimeter (m2, kg): General Free; Special none; Column 2 75%.
- 7419.80.06 Other (under: Cloth): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 7419.80.06.60 Fourdrinier wires, seamed or not seamed, suitable for use in papermaking machines, with fewer than 94 or more wires to the lineal centimeter (m2, kg).
- 7419.80.06.80 Other (under: Other) (m2, kg).
- 7419.80.09.00 Other (under: Cloth (including endless bands), grill and netting, of copper wire; expanded metal of copper) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 7419.80.15.00 Containers of a kind normally carried on the person, in the pocket or in the handbag (doz.): General 3%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
- 7419.80.16.00 Copper springs (under: Other) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7419.80.17.00 Chain and parts thereof (under: Other) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7419.80.30.00 Coated or plated with precious metal (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7419.80.50 Other (under: Other): General Free; Special none; Column 2 46%.
- 7419.80.50.10 Brass plumbing goods not elsewhere specified or included (kg).
- 7419.80.50.50 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.