HTS Heading 7501
Nickel mattes, nickel oxide sinters and other intermediate products of nickel metallurgy
All 2 HTS codes under heading 7501 (nickel mattes), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7501
- 7501 Nickel mattes, nickel oxide sinters and other intermediate products of nickel metallurgy.
- 7501.10.00.00 Nickel mattes (under: Nickel mattes, nickel oxide sinters and other intermediate products of nickel metallurgy) (kg, Ni kg): General Free; Special none; Column 2 Free.
- 7501.20.00.00 Nickel oxide sinters and other intermediate products of nickel metallurgy (kg, Ni kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.