HTS Chapter 75
Nickel and articles thereof
The 8 headings and 29 HTS codes of chapter 75 (nickel and articles thereof), with their duty rates from the 2026 HTS Revision 23.
The 8 headings of chapter 75
- 7501: Nickel mattes, nickel oxide sinters and other intermediate products of nickel metallurgy (2 codes, General duty Free)
- 7502: Unwrought nickel (2 codes, General duty Free)
- 7503: Nickel waste and scrap (1 code, General duty Free)
- 7504: Nickel powders and flakes (2 codes, General duty Free)
- 7505: Nickel bars, rods, profiles and wire (10 codes, General duty 2.5% to 3%)
- 7506: Nickel plates, sheets, strip and foil (6 codes, General duty 2.5% to 3%)
- 7507: Nickel tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves) (3 codes, General duty 2% to 3%)
- 7508: Other articles of nickel (3 codes, General duty 3%)
Where it sits in the schedule
Chapter 75 is in Section XV of the Harmonized System, base metals and their articles (chapters 72 to 83). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.