HTS Heading 7504

Nickel powders and flakes

All 2 HTS codes under heading 7504 (nickel powders and flakes), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7504

  • 7504.00.00 Nickel powders and flakes: General Free; Special none; Column 2 6.6¢/kg.
  • 7504.00.00.10 Powders (under: Nickel powders and flakes) (kg).
  • 7504.00.00.50 Flakes (under: Nickel powders and flakes) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.