HTS Heading 7505
Nickel bars, rods, profiles and wire
All 10 HTS codes under heading 7505 (nickel bars, rods, profiles and wire), with their duty rates from the 2026 HTS Revision 23. General duty 2.5% to 3%.
Every line of heading 7505
- 7505 Nickel bars, rods, profiles and wire.
- 7505.11 Of nickel, not alloyed (under: Bars, rods and profiles).
- 7505.11.10.00 Cold-formed (under: Bars and rods) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7505.11.30.00 Not cold-formed (under: Bars and rods) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7505.11.50.00 Profiles (under: Of nickel, not alloyed) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7505.12 Of nickel alloys (under: Bars, rods and profiles).
- 7505.12.10.00 Cold-formed (under: Bars and rods) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7505.12.30.00 Not cold-formed (under: Bars and rods) (kg): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7505.12.50.00 Profiles (under: Of nickel alloys) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7505.21 Of nickel, not alloyed (under: Wire).
- 7505.21.10.00 Cold-formed (under: Of nickel, not alloyed) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7505.21.50.00 Not cold-formed (under: Of nickel, not alloyed) (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7505.22 Of nickel alloys (under: Wire).
- 7505.22.10.00 Cold-formed (under: Of nickel alloys) (kg): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7505.22.50.00 Not cold-formed (under: Of nickel alloys) (kg): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
From MFG Calcs data: Nickel and nickel alloys
U.S. imports of nickel and nickel alloys (headings 7502, 7505, 7506, 7507) came to $2.33B in 2025, with $102M in calculated duty: an effective duty of 4.4%, every duty included.
Effective duty in Sep 2026: 3.3%, against 5.2% in Sep 2025.
Largest sources in 2025: Canada $832M at 0.1% effective duty; Norway $228M at 1.3% effective duty; Germany $208M at 9.3% effective duty; United Kingdom $179M at 5.5% effective duty; Japan $170M at 6.7% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.