HTS Heading 7507

Nickel tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves)

All 3 HTS codes under heading 7507 (nickel tubes), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 3%.

Every line of heading 7507

  • 7507 Nickel tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves).
  • 7507.11.00.00 Of nickel, not alloyed (under: Tubes and pipes) (kg): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 7507.12.00.00 Of nickel alloys (under: Tubes and pipes) (kg): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 7507.20.00.00 Tube or pipe fittings (under: Nickel tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves)) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

From MFG Calcs data: Nickel and nickel alloys

U.S. imports of nickel and nickel alloys (headings 7502, 7505, 7506, 7507) came to $2.33B in 2025, with $102M in calculated duty: an effective duty of 4.4%, every duty included.

Effective duty in Sep 2026: 3.3%, against 5.2% in Sep 2025.

Largest sources in 2025: Canada $832M at 0.1% effective duty; Norway $228M at 1.3% effective duty; Germany $208M at 9.3% effective duty; United Kingdom $179M at 5.5% effective duty; Japan $170M at 6.7% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.