HTS Heading 7508

Other articles of nickel

All 3 HTS codes under heading 7508 (other articles of nickel), with their duty rates from the 2026 HTS Revision 23. General duty 3%.

Every line of heading 7508

  • 7508 Other articles of nickel.
  • 7508.10.00.00 Cloth, grill and netting, of nickel wire (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7508.90 Other (under: Other articles of nickel).
  • 7508.90.10.00 Stranded wire (under: Other) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 7508.90.50.00 Other (under: Other) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.