HTS Heading 7601
Unwrought aluminum
All 13 HTS codes under heading 7601 (unwrought aluminum), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%.
Every line of heading 7601
- 7601 Unwrought aluminum.
- 7601.10 Aluminum, not alloyed (under: Unwrought aluminum).
- 7601.10.30.00 Of uniform cross section throughout its length, the least cross-sectional dimension of which is not greater than 9.5 mm, in coils (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 18.5%.
- 7601.10.60 Other (under: Aluminum, not alloyed): General Free; Special none; Column 2 11%.
- 7601.10.60.40 Of 99.9 percent aluminum or greater (kg).
- 7601.10.60.45 Of greater than 99.8 percent but less than 99.9 percent (kg).
- 7601.10.60.90 Other (under: Other) (kg).
- 7601.20 Aluminum alloys (under: Unwrought aluminum).
- 7601.20.30.00 Of uniform cross section throughout its length, the least cross-sectional dimension of which is not greater than 9.5 mm, in coils (kg): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 18.5%.
- 7601.20.60.00 Containing 25 percent or more by weight of silicon (kg): General 2.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 7601.20.90 Other (under: Other): General Free; Special none; Column 2 10.5%.
- 7601.20.90.30 Aluminum vanadium master alloy (kg).
- 7601.20.90.45 Of uniform circular cross section throughout its length, the foregoing comprised of billets, not in coils (kg).
- 7601.20.90.60 Other, containing 0.03 percent or more by weight of lead (secondary aluminum) (kg).
- 7601.20.90.75 Remelt scrap ingot (under: Other) (kg).
- 7601.20.90.80 Sheet ingot (slab) of a kind described in statistical note 3 to this chapter (kg).
- 7601.20.90.85 Foundry ingot of a kind described in statistical note 4 to this chapter (kg).
- 7601.20.90.95 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.