HTS Heading 7616

Other articles of aluminum

All 17 HTS codes under heading 7616 (other articles of aluminum), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%.

Every line of heading 7616

  • 7616 Other articles of aluminum.
  • 7616.10 Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles.
  • 7616.10.10.00 Nails, tacks and staples (under: Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles) (kg): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.10.30.00 Rivets (under: Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles) (kg): General 4.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.10.50.00 Cotters and cotter pins (under: Nails, tacks, staples (other than those of heading 8305), screws, bolts, nuts, screw hooks, rivets, cotters, cotter pins, washers and similar articles) (kg): General 5.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.10.70 Having shanks, threads or holes over 6 mm in diameter: General 5.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.75% (JP); Column 2 45%.
  • 7616.10.70.30 Threaded fasteners (under: Having shanks, threads or holes over 6 mm in diameter) (kg).
  • 7616.10.70.90 Other (under: Having shanks, threads or holes over 6 mm in diameter) (kg).
  • 7616.10.90 Other (under: Other): General 6%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.10.90.30 Threaded fasteners (under: Other) (kg).
  • 7616.10.90.90 Other (under: Other) (kg).
  • 7616.91.00.00 Cloth, grill, netting and fencing, of aluminum wire (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.99 Other (under: Other).
  • 7616.99.10.00 Luggage frames (under: Other) (kg): General Free; Special none; Column 2 45%.
  • 7616.99.51 Other (under: Other): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7616.99.51.20 Laminated goods consisting of 2 or more flat-rolled sheets of aluminum held together with an adhesive or having a core of non-metallic material (kg).
  • 7616.99.51.30 Ladders (under: Other) (No.).
  • 7616.99.51.40 Venetian blinds and parts thereof (No.).
  • 7616.99.51.50 Hangers and supports for pipes and tubes (kg).
  • 7616.99.51.60 Castings (under: Other) (kg).
  • 7616.99.51.70 Forgings (under: Other) (kg).
  • 7616.99.51.75 Articles of wire (under: Other) (kg).
  • 7616.99.51.90 Other (under: Other) (kg).

From MFG Calcs data: Aluminum articles

U.S. imports of aluminum articles (heading 7616) came to $1.92B in 2025, with $598M in calculated duty: an effective duty of 31.1%, every duty included.

Effective duty in Sep 2026: 43.3%, against 41.1% in Sep 2025.

Largest sources in 2025: China $438M at 60.9% effective duty; Mexico $413M at 17.2% effective duty; Canada $174M at 18.1% effective duty; Vietnam $116M at 27.4% effective duty; Germany $108M at 22.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.