HTS Heading 7801
Unwrought lead
All 5 HTS codes under heading 7801 (unwrought lead), with their duty rates from the 2026 HTS Revision 23.
Every line of heading 7801
- 7801 Unwrought lead.
- 7801.10.00.00 Refined lead (under: Unwrought lead) (kg): General 2.5% on the value of the lead content; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7801.91.00.00 Containing by weight antimony as the principal other element (kg, Pb kg): General 2.5% on the value of the lead content; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7801.99 Other (under: Other).
- 7801.99.30.00 Lead bullion (under: Other) (kg, Pb kg): General 2.5% on the value of the lead content; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10.5%.
- 7801.99.90 Other (under: Other): General 2.5% on the value of the lead content; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 7801.99.90.30 Alloys of lead (under: Other) (kg, Pb kg).
- 7801.99.90.50 Other (under: Other) (kg, Pb kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.