HTS Heading 7802
Lead waste and scrap
All 2 HTS codes under heading 7802 (lead waste and scrap), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7802
- 7802.00.00 Lead waste and scrap: General Free; Special none; Column 2 11.5%.
- 7802.00.00.30 Obtained from lead-acid storage batteries (kg, Pb kg).
- 7802.00.00.60 Other (under: Lead waste and scrap) (kg, Pb kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.