HTS Heading 7804
Lead plates, sheets, strip and foil; lead powders and flakes
All 3 HTS codes under heading 7804 (lead plates, sheets, strip and foil), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.
Every line of heading 7804
- 7804 Lead plates, sheets, strip and foil; lead powders and flakes.
- 7804.11.00.00 Sheets, strip and foil of a thickness (excluding any backing) not exceeding 0.2 mm (kg): General 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7804.19.00.00 Other (under: Plates, sheets, strip and foil) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7804.20.00.00 Powders and flakes (under: Lead plates, sheets, strip and foil; lead powders and flakes) (kg): General Free; Special none; Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.