HTS Heading 7806

Other articles of lead

All 3 HTS codes under heading 7806 (other articles of lead), with their duty rates from the 2026 HTS Revision 23. General duty 1.2% to 3%.

Every line of heading 7806

  • 7806 Other articles of lead.
  • 7806.00.03.00 Lead bars, rods, profiles and wire (kg): General 1.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7806.00.05.00 Lead tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves) (kg): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7806.00.80.00 Other (under: Other articles of lead) (kg): General 3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.