HTS Heading 8102

Molybdenum and articles thereof, including waste and scrap

All 7 HTS codes under heading 8102 (molybdenum and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.6%.

Every line of heading 8102

  • 8102 Molybdenum and articles thereof, including waste and scrap.
  • 8102.10.00.00 Powders (under: Molybdenum and articles thereof, including waste and scrap) (kg, Mo kg): General 9.1¢/kg on molybdenum content + 1.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.10/kg on molybdenum content + 15%.
  • 8102.94.00.00 Unwrought molybdenum, including bars and rods obtained simply by sintering (kg, Mo kg): General 13.9¢/kg on molybdenum content + 1.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.10/kg on molybdenum content + 15%.
  • 8102.95 Bars and rods, other than those obtained simply by sintering, profiles, plates, sheets, strip and foil.
  • 8102.95.30.00 Bars and rods (under: Bars and rods, other than those obtained simply by sintering, profiles, plates, sheets, strip and foil) (kg): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8102.95.60.00 Other (under: Bars and rods, other than those obtained simply by sintering, profiles, plates, sheets, strip and foil) (kg): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8102.96.00.00 Wire (under: Other) (kg): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8102.97.00.00 Waste and scrap (under: Other) (kg, Mo kg): General Free; Special none; Column 2 Free.
  • 8102.99.00.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.