HTS Heading 8301

Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal

All 19 HTS codes under heading 8301 (padlocks and locks), with their duty rates from the 2026 HTS Revision 23. General duty 2.3% to 6.1%.

Every line of heading 8301

  • 8301 Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal.
  • 8301.10 Padlocks (under: Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal).
  • 8301.10.20.00 Not over 3.8 cm in width (under: Not of cylinder or pin tumbler construction) (doz.): General 2.3%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 39.5%.
  • 8301.10.40.00 Over 3.8 cm but not over 6.4 cm in width (doz.): General 3.8%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 29.5%.
  • 8301.10.50.00 Over 6.4 cm in width (under: Not of cylinder or pin tumbler construction) (doz.): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28.5%.
  • 8301.10.60 Not over 3.8 cm in width (under: Of cylinder or pin tumbler construction): General 6.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 27%.
  • 8301.10.60.20 Lock bodies containing hardened steel components with attached (or insertable) flexible cable composed of wire strands and hardened steel beads (doz.).
  • 8301.10.60.80 Other (under: Not over 3.8 cm in width) (doz.).
  • 8301.10.80.00 Over 3.8 cm but not over 6.4 cm in width (doz.): General 4.8%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 36%.
  • 8301.10.90.00 Over 6.4 cm in width (under: Of cylinder or pin tumbler construction) (doz.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 29.5%.
  • 8301.20.00 Locks of a kind used on motor vehicles: General 5.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.20.00.30 Non-integral steering wheel immobilizer devices (doz.).
  • 8301.20.00.60 Other (under: Locks of a kind used on motor vehicles) (kg).
  • 8301.30.00 Locks of a kind used for furniture: General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.30.00.60 Cam locks and other locks suitable for use with chests, drawers and similar items (kg).
  • 8301.30.00.90 Other (under: Locks of a kind used for furniture) (kg).
  • 8301.40 Other locks (under: Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal).
  • 8301.40.30.00 Luggage locks (under: Other locks) (doz.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.40.60 Other (under: Other locks): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.85% (JP); Column 2 45%.
  • 8301.40.60.30 Door locks, locksets and other locks suitable for use with interior or exterior doors (except garage, overhead or sliding doors) (kg).
  • 8301.40.60.60 Other (under: Other) (kg).
  • 8301.50.00.00 Clasps and frames with clasps, incorporating locks (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.60.00 Parts (under: Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal): General 2.8%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.60.00.10 Of copper or copper alloys (under: Parts) (kg).
  • 8301.60.00.60 Other (under: Parts) (kg).
  • 8301.70.00 Keys presented separately (under: Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal): General 4.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8301.70.00.10 Of copper or copper alloys (under: Keys presented separately) (kg).
  • 8301.70.00.60 Other (under: Keys presented separately) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.