HTS Heading 8302
Base metal mountings, fittings and similar articles suitable for furniture, doors, staircases, windows, blinds, coachwork, saddlery, trunks, chests, caskets or the like; base metal hat racks, hat-pegs, brackets and similar fixtures; castors with mountings of base metal; automatic door closers of base metal; and base metal parts thereof
All 36 HTS codes under heading 8302 (base metal mountings), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.5%.
Every line of heading 8302
- 8302 Base metal mountings, fittings and similar articles suitable for furniture, doors, staircases, windows, blinds, coachwork, saddlery, trunks, chests, caskets or the like; base metal hat racks, hat-pegs, brackets and similar fixtures; castors with mountings of base metal; automatic door closers of base metal; and base metal parts thereof.
- 8302.10 Hinges, and parts thereof (under: Base metal mountings, fittings and similar articles suitable for furniture, doors, staircases, windows, blinds, coachwork, saddlery, trunks, chests, caskets or the like; base metal hat racks, hat-pegs, brackets and similar fixtures; castors with mountings of base metal; automatic door closers of base metal; and base metal parts thereof).
- 8302.10.30.00 Designed for motor vehicles (under: Of iron or steel, of aluminum or of zinc) (kg): General 2%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8302.10.60 Other (under: Of iron or steel, of aluminum or of zinc): General 3.5%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.10.60.30 Suitable for interior and exterior doors (except garage, overhead or sliding doors) (kg).
- 8302.10.60.60 Suitable for furniture and cabinets (kg).
- 8302.10.60.90 Other (under: Other) (kg).
- 8302.10.90 Other (under: Hinges, and parts thereof): General 3.4%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.10.90.30 Suitable for interior and exterior doors (except garage, overhead or sliding doors) (kg).
- 8302.10.90.60 Suitable for furniture and cabinets (kg).
- 8302.10.90.90 Other (under: Other) (kg).
- 8302.20.00.00 Castors, and parts thereof (under: Base metal mountings, fittings and similar articles suitable for furniture, doors, staircases, windows, blinds, coachwork, saddlery, trunks, chests, caskets or the like; base metal hat racks, hat-pegs, brackets and similar fixtures; castors with mountings of base metal; automatic door closers of base metal; and base metal parts thereof) (kg): General 5.7%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.30 Other mountings, fittings and similar articles suitable for motor vehicles; and parts thereof.
- 8302.30.30 Of iron or steel, of aluminum or of zinc: General 2%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8302.30.30.10 Pneumatic cylinders for lifting, lowering, dampening or counter-balancing (No.).
- 8302.30.30.60 Other (under: Of iron or steel, of aluminum or of zinc) (kg).
- 8302.30.60.00 Other (under: Other mountings, fittings and similar articles suitable for motor vehicles; and parts thereof) (kg): General 3.5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.41 Suitable for buildings (under: Other mountings, fittings and similar articles, and parts thereof).
- 8302.41.30.00 Door closers (except automatic door closers), and parts thereof (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.41.60 Of iron or steel, of aluminum or of zinc: General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.41.60.15 Doorstops, chain door fasteners, door pulls, kick plates, door knockers and escutcheons (kg).
- 8302.41.60.45 Other (under: Suitable for interior and exterior doors (except garage, overhead or sliding doors)) (kg).
- 8302.41.60.50 For curtains, draperies and window shades (kg).
- 8302.41.60.80 Other (under: Of iron or steel, of aluminum or of zinc) (kg).
- 8302.41.90 Other (under: Other): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.41.90.15 Doorstops, chain door fasteners, door pulls, kick plates, door knockers and escutcheons (kg).
- 8302.41.90.45 Other (under: Suitable for interior and exterior doors (except garage, overhead or sliding doors)) (kg).
- 8302.41.90.50 For curtains, draperies and window shades (kg).
- 8302.41.90.80 Other (under: Other) (kg).
- 8302.42 Other, suitable for furniture.
- 8302.42.30 Of iron or steel, of aluminum or of zinc: General 3.9%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.42.30.10 Pneumatic cylinders for lifting, lowering, dampening or counterbalancing (No.).
- 8302.42.30.15 Drawer slides (under: Of iron or steel, of aluminum or of zinc) (kg).
- 8302.42.30.65 Other (under: Of iron or steel, of aluminum or of zinc) (kg).
- 8302.42.60.00 Other (under: Other, suitable for furniture) (kg): General 3.4%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.49 Other (under: Other mountings, fittings and similar articles, and parts thereof).
- 8302.49.20.00 Coated or plated with precious metal (kg): General 7.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 8302.49.40.00 Other (under: Harness and saddlery or riding-bridle hardware, and parts thereof) (kg): General Free; Special none; Column 2 50%.
- 8302.49.60 Of iron or steel, of aluminum or of zinc: General 5.7%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.49.60.35 Pneumatic cylinders for lifting, lowering, dampening or counterbalancing (No.).
- 8302.49.60.45 For railway vehicles (under: Other) (kg).
- 8302.49.60.55 For aircraft, vessels and other vehicles (except motor vehicles) of section XVII (kg).
- 8302.49.60.85 Other (under: Other) (kg).
- 8302.49.80 Other (under: Other): General 3.5%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.49.80.40 Of copper (under: For railway vehicles, aircraft, vessels and other vehicles (except motor vehicles) of section XVII) (kg).
- 8302.49.80.50 Other (under: For railway vehicles, aircraft, vessels and other vehicles (except motor vehicles) of section XVII) (kg).
- 8302.49.80.90 Other (under: Other) (kg).
- 8302.50.00.00 Hat-racks, hat pegs, brackets and similar fixtures, and parts thereof (kg): General Free; Special none; Column 2 40%.
- 8302.60 Automatic door closers, and parts thereof.
- 8302.60.30.00 Automatic door closers (under: Automatic door closers, and parts thereof) (kg): General 3.9%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8302.60.90.00 Parts (under: Automatic door closers, and parts thereof) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.