HTS Heading 8305
Fittings for looseleaf binders or files, letter clips, letter corners, paper clips, indexing tags and similar office articles, and parts thereof, of base metal; staples in strips (for example, for offices, upholstery, packaging), of base metal
All 6 HTS codes under heading 8305 (fittings for looseleaf binders or files), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.
Every line of heading 8305
- 8305 Fittings for looseleaf binders or files, letter clips, letter corners, paper clips, indexing tags and similar office articles, and parts thereof, of base metal; staples in strips (for example, for offices, upholstery, packaging), of base metal.
- 8305.10.00 Fittings for looseleaf binders or files: General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8305.10.00.10 Ring binder mechanisms (under: Fittings for looseleaf binders or files) (kg).
- 8305.10.00.50 Other (under: Fittings for looseleaf binders or files) (kg).
- 8305.20.00.00 Staples in strips (under: Fittings for looseleaf binders or files, letter clips, letter corners, paper clips, indexing tags and similar office articles, and parts thereof, of base metal; staples in strips (for example, for offices, upholstery, packaging), of base metal) (kg): General Free; Special none; Column 2 4%.
- 8305.90 Other, including parts (under: Fittings for looseleaf binders or files, letter clips, letter corners, paper clips, indexing tags and similar office articles, and parts thereof, of base metal; staples in strips (for example, for offices, upholstery, packaging), of base metal).
- 8305.90.30 Paper clips, and parts thereof: General Free; Special none; Column 2 45%.
- 8305.90.30.10 Wholly of wire (under: Paper clips, and parts thereof) (kg).
- 8305.90.30.50 Other (under: Paper clips, and parts thereof) (kg).
- 8305.90.60.00 Other (under: Other, including parts) (kg): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.